test
Jums vēl nav paziņojumu

Darba jūrā direktorijs: Kravas plānošana

2025. gada 11. marts
1407
General (532)
Before the cargo is loaded onboard it is clearly essential to calculate and take into account: (a)          The weights involved (b)          Draft limitations (c)          Air draft limitations (from sea level to top of hatch coaming) (d)          Permissible load limitations (e)          Cargo gear and equipment limitations (f)           Safety considerations (g)          Stowage factors (h)          Stability and stress (i)           Dangerous cargo parameters (j)           Segregation (k)          Agricultural/biological regulations (l)           Environmental regulations (m)        Local, national and international regulations (n)          Office operational advice (o)          Shippers requirements (p)          Special handling considerations (q)          Lashing requirements (r)           Ventilation (s)          Sequence of discharge, etc. ACCEPTING AND RECEIVING CARGO Upon notification of a cargo reference to job at sea to be loaded or receipt of a loading list the Master and Chief Officer must carefully study the Company’s Regulations on the carriage of cargo, the shipper’s instructions and the comprehensive advice contained in Thomas’s Stowage – “The Properties and Stowage of Cargoes” or any other Stowage Publications that the Company may place on board. Once it is established that spaces onboard are suitable, (ventilation, etc.) a check should be  made  that  stowage  equipment  (lashings,  dunnage,  separation  sheets,  insulating materials, disinfectant, agents/stevedores. etc.) is either held onboard or available through local Prior to commencement of loading the Master and Chief Officer, together with the shore superintendent/chief tally clerk, will make a thorough examination of the cargo to be loaded. The extent of this examination will depend on the nature of the commodity to be loaded, however, the following are some of the points to be borne in mind.
Iepriekšējais Nākamais
21.04.2026
1920

Kapteinis (Master): karjeras sākums

20.04.2026
1656

Ceturtais mehāniķis (4/E): karjeras sākums

20.04.2026
1642

Galvenais mehāniķis (C/E): amata sākums

20.04.2026
1405

Trešais stūrmanis (3/O): sākums amatā