test
You have no notifications yet

Seacareer Records : BALLAST OPERATION

March 11, 2025
1488
General (532)
Sounding Pipes Sounding pipes are to have about two litres of antifreeze added to prevent the water from freezing. This antifreeze is to remain in the pipes and replenished as necessary until all ballast has been discharged. Filling Procedures When ballasting, the double bottom tanks should be filled first, followed by the Fore Peak and the After Peak. When ballasting the topside tanks, efforts should be made to complete the filling in one operation in order to maintain a continuous flow in the ballast main. It is advisable to remove the manhole covers whether freezing is occurring. To observe the condition inside the tanks reference to seacareer observations and to ascertain THE TANKS MUST NOT BE OVERFLOWED AS A FREEZE UP WILL SEVERELY DAMAGE THE VESSEL’S STRUCTURE Sufficient ballast must be shipped to keep the propeller submerged and, when practicable, preferably below the ice line
Previous Next
21.04.2026
1879

Master (Captain): Start in Rank

20.04.2026
1622

Fourth Engineer (4/E): Start in Rank and Career Foundation

20.04.2026
1617

Chief Engineer (C/E): Start in Rank

20.04.2026
1378

Third Officer (3/O): Start in Rank